
How to Get a Registered Survey Plan in Lagos (Step-by-Step)
This is a complete, easy-to-follow guide for getting a registered survey plan in Lagos, including securing the Red Copy. These are the general steps required, whether you're in Nigeria or abroad.
The process begins by contacting a licensed and experienced land surveyor in Lagos. Share the following details:
-
The location or address of the land
-
The number of plots (or size in square meters)
-
Your full name as the landowner (for the title)
-
survey fees vary by location (zones) and land size. Once your surveyor calculates the total size, you'll receive a detailed quote:
-
80% goes to Lagos State Ministry for documentation (MDS Fee)
-
20% covers site work and office drafting

The process begins by contacting a licensed and experienced land surveyor in Lagos. Share the following details:
-
The location or address of the land
-
The number of plots (or size in square meters)
-
Your full name as the landowner (for the title)
-
The licensed surveyor visits your land to:
-
Collect boundary coordinates
-
Confirm land dimensions and terrain
-
Save coordinate data securely for drafting

Back in the office, the surveyor uses the site data to create a CAD-based draft of the survey plan. This draft:
-
Is checked for accuracy
-
May be edited before the final printing
-
Is prepared both in hard and soft copy
📐 We ensure your draft is ministry-compliant and processed without mistakes.

With the completed plan:
-
The surveyor files it at the Lagos State Surveyor-General’s Office
-
Processing for the Red Copy begins (your official registration)
📌 At Zigi Geospatial Consult, we handle this entire process — your plan doesn’t just sit in someone’s file.
📤 Let us handle the bureaucracy while you relax.

After registration:
-
A soft copy of the final survey plan is sealed and signed by a registered surveyor and scanned to the client
-
A hard copy is also signed, sealed, and delivered to your address or representative in Nigeria
-
Once the Record Copy (also known as the Red Copy or Certificate of Deposit) is ready, it is sent to the client as part of the final documentation
-
This marks the official registration of your land with the Lagos State Ministry
📦 Final delivery includes everything — signed documents, digital copies, and full Red Copy confirmation.
📬 Your documents, delivered. Your ownership is secured.
⏳ Typical Timelines
-
Survey Plan Delivery: 2–3 weeks after fieldwork
-
Red Copy Registration: Up to 3 months
📣 Zigi Geospatial Consult offers updates every step of the way, so you’re never in the dark.
📆 Start now so you don’t lose more time — get started with a quote today.